Wildomar Foundry RoofingCompare Wildomar roofing quotes without the runaround.Get a quote

Wildomar, CA

Replacing a roof in Wildomar: what it takes

A re-roof is the second-largest cheque most homeowners write on their house, and the one they have the least information about.

Describe the replacement job

Three questions, then the address. Up to three Wildomar contractors who do this work.

Free estimate · No obligation

Describe the replacement job

Three questions, then the address. Up to three Wildomar contractors who do this work.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Free. You are not committing to anything.

Before you let anybody on the roof

The things worth pinning down on a replacement job. A contractor who has not raised them has not looked properly.

  • Who pulls the permit, and what the inspection schedule looks like
  • Ventilation: what is there now, what it should be
  • Which underlayment, and whether ice-and-water goes on the eaves and valleys
  • Tear-off or overlay, and what the local code allows
  • A written per-sheet price for replacing bad decking

Insist on knowing what happens to decking that turns out to be rotten. The good answer is a per-sheet price agreed in writing before the job starts.

Two quotes at the same price can be very different roofs. Compare the layers, not the brand name on the shingle.

Ask how long the crew has been together. Roofing is a trade where the same company name can mean an entirely different set of hands from one season to the next.

Locally

The second problem is shaded slopes that never really dry out. The north side of a house here ages years faster than the south side, and almost every roof gets replaced because of it.

About replacement here

Do you handle commercial buildings?

Yes. Commercial requests go to contractors who do low-slope and flat systems rather than to residential crews. Say so on the property question and it routes correctly.

How much deposit is normal?

Ten to thirty per cent is ordinary, and is often used to order material. A demand for full payment up front is a reason to walk away.

What if the decking is rotten underneath?

Some of it usually is. The important thing is that the price per sheet is agreed in writing before the tear-off, so the conversation on day two is about quantity rather than rate.

Can I just put a new roof over the old one?

Codes in most places allow two layers. That does not make it wise. You lose the chance to see the deck, and the next roofer has twice as much to remove.

Ready for a real number?

Three questions, about a minute, and up to three Wildomar contractors come back to you.