Wildomar Foundry RoofingCompare Wildomar roofing quotes without the runaround.Get a quote

Get roofing quotes in Wildomar

Answer three questions, give the address, leave a number. Contractors covering Wildomar take it from there — at most three of them, and none of it costs you anything.

Start here

It takes about a minute.

Free estimate · No obligation

Start here

It takes about a minute.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Free. You are not committing to anything.

What happens after you tap send

The whole thing is a form and a routing rule. What happens after it is contractors, on the phone, today.

Describe the job

Three short questions, all multiple choice. It takes about as long as reading this sentence twice.

It goes to local crews

We route it to roofing companies covering your ZIP — the ones who do this kind of work, not whoever paid the most.

Real numbers, then your call

Contractors contact you directly and quote after seeing the roof. There is no fee and nothing to cancel.

Daylight showing through a gap in roof decking seen from inside an attic
Daylight through the decking, seen from the attic
A tear-off in progress with old shingles stripped to bare decking
Tear-off in progress, decking exposed

Illustrative photographs of roofing work in general. Not photographs of jobs arranged through this site.

Quick, then quiet. A minute to send, and the calls start today rather than next week.

No cost to the homeowner. Ever, at any stage. That is the whole arrangement, stated plainly.

Your details stay put. They go to the matched contractors and nowhere else. Never a mailing list.

Vetted before they hear from you. Licence checked, insurance certificates held, coverage area confirmed.

Before you start

What if the decking is rotten underneath?

Some of it usually is. The important thing is that the price per sheet is agreed in writing before the tear-off, so the conversation on day two is about quantity rather than rate.

Are you a roofing company?

No, and it matters that we say so. We are a referral service, not a contractor. The roofing work, the licence, the insurance and the warranty all sit with the independent company you choose.

Should I take the cheapest quote?

Only if it is the same roof. Most large gaps between quotes are scope gaps. Ask the cheapest contractor which of the other quotes items they have left out, and why.

How much deposit is normal?

A third at most, and never the full amount. Pay the balance when the job is finished and you have walked it. Some states cap the deposit by law.

How long should a roof last here?

An architectural asphalt roof is rated for twenty-five to thirty years and, in this climate, tends to land at the lower end of that. Tile and metal go much further, provided what is underneath them is maintained.

Can I just put a new roof over the old one?

Often you legally can, and it is usually a poor idea. Overlaying hides the condition of the decking, adds weight, shortens the life of the new shingles by trapping heat, and doubles the cost of the next tear-off.

Why not just search and call three companies?

Emergencies go first

A live leak is not the same request as budgeting for next spring, and it does not sit in the same queue.

Faster than ringing round

The awkward part of getting quotes is the fifth phone call, not the first. This does that part once.

Right trade, first time

Flat roofs, tile relays and metal are separate trades. The questions exist so a shingle crew is not sent to a low-slope job.

It costs you nothing

Contractors pay for introductions. You pay nothing at any point, and we would rather say that plainly than bury it.

Rain sheeting off a roof edge into a gutter
Rain running off the eave into the gutter

Illustrative photographs of roofing work in general. Not photographs of jobs arranged through this site.