Guide
How to pick a roofer you will not regret
You are not really buying shingles. You are buying four days of somebody else's workmanship, and hoping the company still exists when you need the warranty.
Get it looked at
Three questions, and up to three Wildomar contractors. Free either way.
You are on the list.
No provider in Wildomar is taking requests through this service yet. We are lining them up, and yours is kept until one can.
- Nobody gets your details yet. Your request stays with us and is not passed to any company.
- One email when someone can help. When a provider covering your area can take it on, we email you once and ask whether you want that company, by name, to contact you.
- Deleted after 90 days. If nobody can take it on, or you do not say yes, your contact details are deleted 90 days after your request.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
Nobody will call you about this request unless you say yes to a company by name.
Compare scope, not totals
A cheaper number for less roof is not a better price. Ask the lowest bidder which items on the other quotes they have left out, and why they think you do not need them.
Check the licence yourself
Every state that licenses roofing contractors publishes a free lookup. It takes two minutes and tells you whether the licence is current, who holds it, and whether there are complaints against it. Do it even when somebody has already vouched for them.
Be careful with the deposit
Never pay in full up front, and never in cash without a receipt that names the company. Progress payments tied to milestones protect both sides.
Ask for current certificates of insurance
Insurance certificates expire. A certificate dated eight months ago tells you what was true eight months ago. Ask for one issued this month.
Prefer somebody you could drive to
Ask where their yard is. Companies that follow storms across state lines do competent work and then vanish, which is fine right up until something needs putting right.
Get everything in writing, including the unknowns
Anything agreed verbally will be remembered differently on day two. In particular, pin down the decking rate, the start date and the clean-up before you sign.
In short
Do the boring checks. They are the entire difference between a roof that is somebody else's problem for ten years and one that is yours.
Related questions
Is moss on the roof a problem?
It matters more than it looks. The damage is not the moss, it is the permanent damp underneath it. Kill it and brush it off gently; never pressure wash asphalt.
How long does a re-roof take?
A straightforward asphalt roof on an average house is one to three days. Tile, slate and complex rooflines take longer, and weather stops work more often than anything else.
What should I do to prepare?
Clear the driveway, protect attic storage from falling dust, and plan for two loud days. Agree in advance where the dumpster goes and who sweeps for nails.
Ready for a real number?
Free, no obligation, and your details go to no company until you say yes.